Thursday, May 17, 2012

Busy month..

...trying to get some work done for some mid year activities, played around with the chopped old buckhorn handlebars,tweaked(chop) my almost $350 Streamline internal throttle anchor sleeve(was a little over my calculated handle bar length)when installed and was still over 1 and a half inch longer than my left side grip so I just had to add more steel to the left side and off to my "monster ninja" welder, polished it a bit, strap some friction tape on it, mocked up the soon to be new cable operated front brake lever to rear brake master pump setup and hope my new bar/riser design will be done soon and tried for rigidity..till then.


Published with Blogger-droid v2.0.4

No comments:

Post a Comment